THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding, This news data comes from:http://aichuwei.com
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.

Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- MMDA readies for FIVB men’s volleyball
- WBO champ looms as Pacquiao’s next opponent
- Berlin urges Israel to 'immediately' improve humanitarian conditions in Gaza
- Taiwan: China illegally deploying oil rigs in our waters
- NBI slaps Alice Guo, 35 Others with new graft, misconduct cases
- Malabon City honors partners
- Alex Eala targets US Open Round of 32 in rematch against Spanish rival
- Ukraine's children start new school year in underground classrooms to avoid Russian bombs
- Wife of Australian man wanted in police killings urges him to surrender
- COA probes Iqbal on spending of P1.7B in one day